1. Daily Maintenance: Performed by: Operator at end of every shift
|
Task |
Description |
Purpose |
|
Clean coating head & tank |
Remove residual adhesive from melter, slot die/nozzle, filters & rollers using recommended cleaning tools or solvent. |
Prevent adhesive carbonization & nozzle blockage. |
|
Check temperature readings |
Compare set temperature vs. actual on all zones (tank, hose, die). |
Maintain correct viscosity & coating quality. |
|
Inspect hoses & fittings |
Look for leaks, cracks, or exposed wires. |
Prevent adhesive leakage & safety hazards. |
|
Lubricate moving parts (lightly) |
Apply thin oil film on exposed shafts, guide rods, or chains (if dry). |
Reduce wear & ensure smooth motion. |
|
Check web path alignment |
Verify substrate runs straight through coating head. |
Avoid coating unevenness & web damage. |
|
Record machine log |
Note production run time, grade of adhesive used, temperature, any anomalies. |
Build preventive maintenance history. |
2. Monthly Maintenance: Performed by: Maintenance / Electrical team
|
Task |
Description |
Purpose |
|
Test heater zones & thermocouples |
Measure response times, verify correct temperature calibration. |
Ensure uniform heating & process stability. |
|
Safety system inspection |
Check E-stop, limit switches, thermal cut-offs, guards & alarms. |
Operator safety. |
|
Check coating width & die lips alignment |
Inspect for uniformity of coating layer. Clean die lips thoroughly. |
Maintain coating precision. |
|
Grease bearings & mechanical joints |
Use manufacturer-recommended grease. |
Prevent bearing wear & noise. |
|
Review operating log |
Analyze temperature trends, downtime causes, and plan improvements. |
Preventive maintenance planning. |
3. Yearly Maintenance, Performed by: Trasy Enterprises Authorized Service Personnel
|
Task |
Description |
Purpose |
|
Adhesive compatibility check |
Inspect tank & hoses for residue or reaction with adhesive type. |
Avoid material degradation. |
|
Complete system calibration |
Calibrate all heaters, sensors, pressure gauges, and load cells. |
Ensure long-term precision. |
|
Overhaul of mechanical assemblies |
Inspect and recondition coating head, rollers, and frame. |
Restore machine to factory performance. |
|
Software / PLC check & backup |
Update firmware or PLC logic if necessary. Backup parameters. |
Maintain control reliability. |
|
Motor & gearbox inspection |
Check motor amperage, vibration, and gearbox oil (if applicable). |
Ensure power transmission efficiency. |
|
Roller & coating head alignment check |
Verify parallelism using alignment tools. |
Prevent coating streaks & uneven layers. |
|
Inspect control panel |
Clean, tighten, and calibrate sensors, PID, and PLC. |
Stable control & communication. |
|
Replace worn parts |
Replace seals, nozzles, filters, and gaskets. |
Prevent leaks & maintain quality. |
General Tips from Trasy Enterprises
Search
Category
Recent Posts
Hi! Simply click below and type your query.
Our experts will reply you very soon.
Leave a Comment